LAI Group was engaged to support the Alinta Energy Newman Battery Storage Project—Western Australia’s largest lithium-ion battery installation. Our team delivered custom-engineered electrical infrastructure to integrate the 35MW battery system with the high voltage network, supporting improved performance and reliability for major industrial operations in the Pilbara region. Through precision design and manufacturing, LAI Group played a key role in delivering a robust, high-performance solution for one of Australia’s most significant industrial energy projects.

Key Contributions by LAI Group

  • Supply 1 of 15m x 4.5m 33kv Substation
  • Supply and install of protection panels
  • Installation of Battery panels
  • Supply and installation of 3200A LV switchboards
  • Installation of GIS Switchgear
  • Testing and Commissioning